Home About Us Data ValidationClients & Projects Contact Us
  Clients and Projects  

Data verification is the process of evaluating the completeness, correctness, and conformance/adherence of a specific data set against the method, procedural, or contractual requirements.


 AGVIQ, LLC
In 2015 Argon conducted data reivew and validation for 16 projects at Aqviq, LLC for their North Slope Burough contract in Alaska. Our services inculded field data support using EQuIS database. Analytical laboratory data was managed and reported using EQuIS. 

Fairbanks Environmental Services
Argon has provided 3rd party data review and validation services for Fairbanks Environmental Services projects throughout Alaska since 2010.

Since 2010 Argon has provided project chemistry services to Bristol Environmental Remdiation Sevices.  Our projects range from EPA site investigations in New Mexico, to federal and commercial contaminated sites characterization throughout Alaska.

AECOM Logo
In 2015 Argon conducted 3rd party data review and validation for AECOM's federal projects in Unalakleet, Kodiak and Eklutna, Alaska. 

WESTON
SOLUTIONS
In 2015 Argon completed third party data validation projects in 2015 for Weston's Federal contracts in Umiat, Ft. Wainwright, and Nuvagapak Alaska.

From 2012-2014 Argon completed on time and under budget, annual water quality analytical laboratory audits and field sampling audits (2013, 2014) for the Donlin Gold Project. The purpose of these audits is to ensure the data is legally defensible, meets state and federal analytical requirements, and all project objectives for permitting.

Argon reviewed Donlin Gold’s annual quality assurance project plan (QAPP) and assessed groundwater results for total and dissolved metals. These reviews resulted in revisions to the QAPP for assessment of metals data to improve the overall analytical program.


Argon worked a subconsultant to R2 Resources, Inc. (R2) on the Susitna-Watana Hydroelectric Project for the Alaska Energy Authority (AEA). R2 is scoped to conduct all of the fishery baseline studies for the Project. Argon provided senior review and technical editing of R2’s technical memorandums and reports prior to submittal to AEA.

Argon is a subconsultant to ERM Alaska, Inc. (ERM) on the Alaska Standalone Pipeline Project for the Alaska Gasline Development Corporation. ERM is scoped to complete the supplemental environmental impact statements (SEIS) for the in state gas pipeline. Argon’s role on this project is to update and manage the project website, assist ERM with public scoping meetings and engagement, data management, QA/QC and conduct senior review of the SEIS.

Data validation is an analyte- and sample-specific process that extends the evaluation of data beyond method, procedural, or contractual conformance to determine the analytical quality of a specific data set (EPA QA/G-8).

Copyright 2014 © Argon, Inc.    Anchorage, Alaska  All rights reserved                                  Website design & Hosting by Alaska Web Designs, LLC